Week ending February 10th –Wet conditions continued to slow down drying of the building pad preventing re-grading and compaction of the pad.
Week beginning February 17th – Hondros completed installation of the new storm sewer system and began connecting existing downspouts from the Sanctuary to the system.
Pictures 1 & 2:
Connecting existing downspouts from the Sanctuary to the new storm sewer system