Hondros began excavation for the building footings adjacent to the Sanctuary. Placement of reinforcing steel (rebar) began after bearing capacity requirements were verified. Rebar placement passed inspections conducted by both our third party and Mecklenburg County inspectors. Dewatering pumps were used to remove rainwater in anticipation of upcoming concrete pours. Excavation for the remaining footings continues.




Pictures 1 & 2: Footing Excavations
Picture 3 & 4: Rebar Footings