Hondros has completed the installation of exterior wall sheathing and continues applying water and vapor barriers on the exterior walls. First floor ductwork installation and interior framing continue. Rough-in installation of second floor electrical and plumbing is also ongoing.





Picture 1: Exterior wall sheathing
Picture 2: Water and vapor barriers on the exterior walls
Pictures 3 & 4: Ductwork installation
Picture 5: Plumbing rough ins