Hondros continued installation of exterior wall sheathing and applying water and vapor barriers on the exterior walls using scaffolding. First floor ductwork installation and interior framing continues. Second floor electrical plumbing rough-ins are ongoing.






Picture 1: Exterior wall sheathing
Picture 2: Water and vapor barriers on the exterior walls
Pictures 3: Interior framing and ductwork
Picture 4: Interior framing
Picture 5: First floor ductwork
Picture 6: Electrical plumbing rough ins