Hondros poured and waterproofed the concrete curb/retaining wall on the East side of the new building. Installation of ceiling hangers and exterior framing clips is ongoing in preparation of selective fireproofing of the steel framing and decking. The installation of interior second floor partition wall studs is also underway.




Pictures 1 & 2: Concrete curb/retaining wall
Pictures 3 & 4: Interior second floor partition wall studs