More Concrete

Hondros completed erecting the structural steel; placed and secured structural decking for the second-floor slab and completed preparation for the concrete pour of the second-floor slab.  The concrete pour began before sunrise on Wednesday.  The concrete was placed on the deck using a concrete pump unit mounted on a truck and a flexible hose/boom system that allows the concrete to be directed to specific locations. Placement and finishing of the concrete were completed by mid-afternoon.

Picture 1:  Completed structural steel framing with structural decking for the second-floor slab and roof

Picture 2:  Second-floor decking prepared for the concrete pour

Picture 3: Concrete pour began before sunrise on Wednesday

Picture 4: Concrete pumping unit

Picture 5:  Second floor concrete pour underway

Picture 6:  Finished second floor concrete slab

Together, we are impacting the community by growing families in Christ through the Word of God. We believe that we are called to look up, look around, and look outward.  Let’s worship our Lord and Savior together!

Messiah is an LCMS Congregation

MESSIAH LUTHERAN CHURCH

8300 Providence Rd
Charlotte, NC 28277

(704) 541-1624

office@messiah-nc.org

Office Hours: Monday-Thursday 8:30am – 3:00pm, and Friday 8:30am – 12:00pm

Messiah Lutheran Church © 2026. All Rights Reserved.