Constructing the Second Floor

Hondros has continued with installation of the structural steel framing including for the connector to the south side of the Narthex.  Installation of the metal decking for the second-floor concrete slab is also well underway.  Form work for a low retaining wall/curb on the East side of the building was also set.

Picture 1:  Structural steel framing for the connector to the Narthex

Picture 2:  Metal decking for the second-floor concrete slab

Picture 3:  Formwork for a low retaining wall/curb